Harrisons Engineering > Projects > Bradbury Salt Hopper

Bradbury Salt Hopper

This works involved  the design, manufacture, installation and supply of a new hopper complete with support structure, to sit onto the exiting foundations. The existing Rock salt hopper was completely dismantled and removed from site. The new hopper was fitted with new cladding and purlin rails as required.  The hopper was galvanised and additional surface protection was incorporated.