BOC Dissolved Acetylene Infrastructure Works, Immingham (Waterways)
C Spencer Limited (June 2012 – September 2012)
This project involved the supply and installation of a road bridge over a waterway. Detailed fabrication drawings were produced and approved; supply of materials, manufacture and painting of the super structure elements; delivery and installation during normal working hours. The 125 Tonne 32 meter long structure was built up and installed in 4 days onto pre-cast abutments using a number of cranes.